Vectis Works · Shop Floor Intelligence

Cumberland Metalworks — Shop Floor Operations

5 Tennessee plants · presses, CNC & injection molding · live from the Kepware gateway stream
Timeframe
Custom
Plant
Type

Trends over time

The 365-day daily gold layer: how effectiveness, output, quality and energy have moved across the selected window. Buckets auto-scale to day / week / month.

Effectiveness trend

OEE with its Availability / Performance / Quality components

Output & scrap trend

Good parts per bucket (bars) with scrap rate overlaid

The floor, right now

One plant drawn as its floor plan — dock doors, staging, and machine bays — with every machine colored by its live state at the snapshot moment (mid-shift on the most recent day) and batch progress under running machines. The other plants stay on the strip above; click one to bring it into focus, or switch to all plants. Hover a machine for its batch, part and operator.

Fleet status

Effectiveness by machine

OEE over the selected timeframe. Compare plants and machine types, then drill into the machines that lag. Colored by machine type.

OEE by plant & type

Fleet OEE grouped two ways for the selected window

Lowest-OEE machines

The machines with the most opportunity in this window

Losses and output

Downtime Pareto by fault reason

Unplanned downtime minutes in the selected timeframe

Loss decomposition

Where planned production time went — the six big losses

Process discipline

Changeover performance and reliability — the plant manager's levers behind availability. Showing the machines furthest from target.

Changeover vs standard

Actual setup minutes ÷ standard — past the 100% line is slower than standard

Reliability — MTBF and MTTR

Mean run hours between unplanned faults (goal ≥ 8 h) and mean minutes to recover

Condition monitoring

Sensor trends over the trailing 30 days — the early-warning layer for maintenance. Channels resolve to each machine type's real sensor (press oil temp & pump vibration, CNC spindle bearing & load, molding barrel & injection pressure).

Machine state timeline

RUN / SETUP / IDLE / FAULTED / DOWN segments over the selected days (trailing 30-day window, staffed hours). Filter to a plant or a single machine to read it.