10 hydraulic presses · Nashville & Dickson, Tennessee · live from the Kepware gateway stream
Timeframe
Custom
Plant
The floor, right now
Layout view of both plants with each press colored by its state at the snapshot moment — mid-shift on the last selected day. Hover a press for its batch, part, and operator.
Fleet status
Effectiveness
OEE = Availability × Performance × Quality, computed per machine per production day from run-state occupancy, ideal cycle times, and part counts.
OEE by machine and day
Cell value = OEE %
Time utilization by machine
Share of staffed hours in the selected timeframe
Losses and output
Downtime Pareto by fault reason
Unplanned downtime minutes in the selected timeframe
Daily output and scrap
Good parts per production day, scrap rate labeled
Process discipline
Are changeovers hitting standard, and how reliable is each press? The plant manager's levers behind the availability number.
Changeover vs standard
Actual setup minutes ÷ standard minutes per machine — past the 100% line is slower than standard
Reliability — MTBF and MTTR
Mean run hours between faults (bars, goal ≥ 8 h) and mean minutes to recover
Machine state timeline
Each row is one press across the selected production days, staffed hours only (07:00–23:00 local).
Condition monitoring
Sensor trends per press over the selected timeframe — the early-warning layer for maintenance. Single days are drawn at 15-minute resolution, longer ranges hourly.